CUT OFF FOR ORDERING: 28th March – delivery to school in time for the 12th May.
The hoodies are printed in 1 batch after the ordering cut off date, and production an take up to 4 week
Please select the option for School Delivery.
This item is not exchangeable/returnable.
Left chest school logo and back print names in 25
Garment Specification
Material: 50% cotton/50% polyester.
Pre-shrunk.
Air jet yarn, softer feel fabric
Drop shoulder style.
Double fabric hood with self colour drawcord*.
Front pouch pocket.
Ribbed trim with spandex at cuffs and hem for fit.
Twin needle stitching for strong seams